The "Change" module allows users to add change requests. A user is a technician who requests a change. A change could also arise from a ticket, a request, or a problem from the requester.

Pre-requisites:

To add a change, the following must be pre-configured

  • Requester - the user requesting the change

  • Priority - priority of the change

  • Change Manager - A Change Manager is usually a domain expert overlooking the change request.

  • Change Implementer - A Change Implementer is the user responsible for implementing the change.

  • Followers - users to be notified of the "change" status updates. Use the "Follow" button to follow directly.

  • Tags - groupings used for the classification of changes.

  • Go to the "Change" page.

  • Click on the "New Change" button.

If requesters have been added already, select the requester's name in the search option. If no requesters have been added or to add a new requester, use the "Add a New Requester" button. Follow the "Requester" module for details. You can select or add a requester from the next page too.

To add a change, follow the steps from the below table:

*Emergency Change is not part of this release. It will be implemented in a future release.

Once all details are added, the user must click "Submit as New" - to submit the change.

  • Go to "Add change"

  • Click on the select template.

The default templates and the ability to create custom templates for planning and specific changes. Ensure seamless data integration and automation tasks for increased efficiency.

Automated Hardware Change Notifications! Enable in feature plan, select an asset, and edit sub-category. Configure templates for custom mail notifications, including logo, keys, and menu order adjustments.

Label

Action

Description/Example

Requester*

Add a new requester or search for an existing requester.

Requesters are usually technicians or users with the required permissions who can add a change.

Reported by

Use the icon to expand this section. Add the reporter's name and email address, if applicable.

Reporters are users raising the change on behalf of the requester.

Change Manager

Select a Change Manager from the list.

A change manager overlooks the change analysis and implementation.

Change Implementer

Instructions to add a Change

Note: When the requester's name is added, Infraon displays the list of past interactions the requester has had. Click on the Change ID to view the details.

Custom Change template creation.

E-mail alerts on asset hardware changes

Select the change implementer from the list.

A change implementer can be a user or a team responsible for implementing the change.

Impact Service

Select the Impact Service from the list.

This can be left blank. As the risk analysis progresses, the technicians can later select the impacted service.

Service Classification

Select the classification within the impacted service.

This is used when a specific service has multiple classifications. For example, if the impacted service is Network, the classifications can be connectivity, router issue, and so on. Leave this field blank if no classifications are defined.

Followers

Select a user to add them as followers.

Users who must be notified of the change request or any changes to the status of the change request can be added as followers. Use the 'Follow' option to self-follow the change request.

Tags

Select a tag to tag the change.

These tags must be predefined in the 'General Settings -> Tag Management module.

Subject

Add a subject line for the change.

The subject line can be a summary of the change. For example: Unable to connect to the network.

Description

Provide a brief description of the change.

Due By

It is the due date by which a team aims to implement the change.

Priority

Select the priority of the change from the list.

Risk

Select the risk level from the list.

Change Type

Select the type of Change from the list.

The changes can be of four types:

Standard Change

Major Change

Minor Change

*Emergency Change

Reason for Change

Specify the reason for requesting the change.

Add attachments

Use the action icon to add an attachment to the change.

Attachments can include emails, screenshots, etc.

Rollout

Specify the plan to rollout the change.

Leave this field blank if the rollout plan is not yet decided.

Rollback

Specify the plan to rollback the changes.

Leave this field blank if the rollback plan is not yet decided.

Change Management

ITIL defines Change as "the addition, modification, or removal of any authorized, planned, or supported service or service component that could affect services." In other words, a Change is adding, removing, or modifying anything that could directly or indirectly affect the organization's services and operations. The changes could include documentation, processes, applications, or IT infrastructure. In Infraon, the module that handles all the change requests is called "Change."

Change Management is a set of processes defined to manage the lifecycle of a change request. It aims to minimize risks and disruptions to IT services and business operations while implementing changes.

Benefits of Change Management

  • Reduced system downtime and outage

  • Faster change implementation

  • Decreased negative impact on business and IT services

  • Visibility into future IT changes

Change Manager - A Change Manager is responsible for reviewing the submitted change requests, scheduling Change Advisory Board(CAB) meetings, updating the change records, reviewing the rollback and rollout plans, coordinating the implementation of changes, and reviewing the implemented changes. Usually, a high-level manager or a Domain Expert is assigned as a Change Manager to a change request.

Change Advisory Board(CAB) - A Change Advisory Board (CAB) may consist of Business, IT Operations, Development, Customer, Domain Experts, and Solution Architects, depending upon the type of the change. A CAB is carefully selected to ensure all facets of an organization are represented while discussing the impacts, benefits, and implementation of a change. CAB requires financial data, the technical advantage of the change request, the number of resources required, criticality, and so on, to make an informed decision on the change request. Depending upon the severity of the change, the Change Manager may decide whom to include in the discussions. A CAB chooses whether to approve or reject a change.

Infraon's Change Management module enables users/organizations to implement changes through the following steps seamlessly:

  • Change Detection is the first step of Change Management. For example, a customer may request a change in the services or ask for additional services. This is logged as a change request. A change request may also arise from a ticket, request, or problem.

  • Change Recording - A technician or user with the required permissions can log a change in the module.

  • Planning—In this stage, the change request is planned. A comprehensive plan is essential for the successful implementation of a change. A detailed plan showcases the risks, impacts, rollout plan, rollback plan, and associated downtime(if any) to all stakeholders. Planning is important in getting approvals from the Change Advisory Board (CAB).

Apart from these, Infraon also covers change ownership, monitoring, tracking, and communication - throughout the life cycle of each change request.

Changes are managed through the "Change" module. Users with appropriate permissions can raise changes. Changes follow multiple state(s) and status(es) throughout their life cycle.

Customized Status(es) can be configured from the 'Workflow' module to suit the requirement.

Demo data for ITSM module change for new Org

Knowledge Base Modules! Explore added knowledge articles to understand the functionality and purpose of KB modules.

Analysis - A detailed analysis is performed to understand a change's risks and impacts on the organization or service(s).
  • Change Approvals - The change plan needs to be reviewed, and the Change Advisory Board (CAB) decides. The change plan may be approved or rejected.

  • Change Implementation - Once approved, the change manager ensures the change is implemented as detailed in the plan and at the right time. A Change Manager also ensures coordination between different teams involved in the change implementation.

  • Review - Once a change is implemented, a post-implementation review is conducted to confirm whether the change was successful. A review is also performed to determine if the change achieved its objectives. If the change implementation is unsuccessful, the rollback plan is activated promptly.

  • Closure - This is the last step in the Change management process. After conducting a post-implementation review, the change can be closed with closing comments on whether the change was successful, executed on time, and so on.

  • State

    Status

    Status Scenario

    Open

    New

    When a new change is logged in the system.

    In Progress

    Planning

    When the planning of the change request is in progress.

    In Progress

    Analysis

    When the possible risk analysis is in progress.

    In Progress

    Implementation

    Essential Roles in Change Management

    Change Management Process

    State and Status

    Easily convert resolved Changes to Knowledge Base articles. KB icon appears post-resolution, ensuring efficient knowledge management.

    Change Management

    When the proposed change plans are being implemented.

    In Progress

    Deployment

    When the change is being deployed in production.

    In Progress

    Verification

    When the deployed change is being verified.

    On Hold

    Pending

    If any changes are pending to be implemented.

    Close

    Closed

    After Post Implementation Review, the change can be closed with closing comments.

    Close

    Cancel

    If the change implementation is canceled.

    ITSM Change Management

    Change

    ITIL defines Change as "the addition, modification, or removal of any authorized, planned, or supported service or service component that could affect IT services." In other words, a Change is adding, removing, or modifying anything that could directly or indirectly affect the organization's services and operations. The changes could include documentation, processes, applications, or IT infrastructure changes.

    Change Management is a set of processes defined to manage the lifecycle of a change request from start to closure. It aims to minimize risks and disruptions to IT services and business operations while the changes are being implemented.

    How does it work?

    Domain experts, management, architects, or solution architects are involved in planning and implementing a change request.

    Types of Change

    Type

    Description

    Example

    Standard Change

    Standard Changes are the ones that frequently occur in an organization. These changes are low-risk and have a pre-defined set of documented and approved processes to be followed. This pre-defined and approved process is called a template.

    Emergency changes are used in urgent situations where immediate change implementation is necessary to fix major issues or avoid significant business impact.

    • Created when a critical issue (like a server outage or security flaw) needs resolution.

    • Follows an accelerated approval path or may skip it altogether depending on settings.

    • A CAB review may still be scheduled post-implementation for audit compliance.

    • Documentation and justification are mandatory to ensure traceability.

    Use Case Example:

    The production server crashes at midnight. The support team performs a hotfix immediately. Right after, an emergency change is logged to ensure that this change is recorded and reviewed.

    Retrospective changes are created to record already implemented changes, often outside of standard workflows. These are essential for capturing unexpected or reactive actions taken in real-time.

    • Useful for manual interventions or critical on-the-spot fixes.

    • Allows post-facto documentation including reason, impact, and CI information.

    • Ensures visibility and inclusion in audit logs or reports.

    • Can be routed for post-change review if needed.

    Use Case Example:

    A network engineer applied a configuration fix during a late-night alert. Since no prior change request was raised, they document it afterward using this change option for internal tracking and compliance.

    The "Change" page lists all change requests in two views: Panel View and Grid View. It lists all changes with details like a summary card, change description, status, subject, team, requester name, and actions, sorted by time.

    Change Management involves people from different dimensions of a business. They work together to analyze, plan, and implement the change request.

    There are two ways to view change details in the right-side panel. They are:

    Panel View - You see change details as a Summary Card in the Panel view. The summary card gives a brief summary of the change. This summary contains all the important information needed to work on the change. Details include:

    • Change ID: Auto-generated when a change is created.

    • Requester: Name of the requester

    • Change Manager: Name of the manager overlooking the change request.

    • Status: Displays the current status of the change. Users can change the status from here as well.

    The panel view for tickets has been revamped. The improved interface offers enhanced data visibility, with aging metrics conveniently displayed. This helps in faster navigation and reduced system load for a seamless user experience.

    Clone Change

    The Clone Change option allows technicians to quickly create a new Change Request (CR) by copying key details from an existing change. This reduces manual data entry, ensures consistency, and speeds up the creation of repeat or similar changes.

    The following fields are automatically copied from the selected change:

    • Subject

    • Change Type

    • Change Manager

    • Change Followers

    • Location

    Fields to Update During Cloning:

    Grid View- In the Grid view, you see change details in tabular form. Clicking on the Change ID shows the change details.

    • Change ID: This is auto-generated when a change is created. Click on the Change ID to view the communication history, reply to and forward emails, add notes, analyze, view, and add work logs.

    • Subject: Subject of the change (derived from the change subject line).

    • Reason for Change: The reason for detailing why the change was requested.

    • Change Type: Type of change: Standard, Major, Minor, and Emergency.

    • When an asset is added to a change, the system checks if the same asset is already linked to other active changes.

    • If a conflict is detected, a warning message displays the conflicting Change IDs.

    • Conflict detection is informational only and does not block the user from proceeding.

    • In the Change Calendar, overlapping scheduled changes involving the same asset are highlighted to indicate potential conflicts.

    Change relationships follow the same structure as defined in . For a detailed explanation of how linked records work, refer to the Problem Management page.

    When a Change Task is created from the module, NCCM sends the Job Execution Details, Job Status, and Job ID to the Change Management module through an API call. The Job ID is stored against the Change Task to maintain traceability between the change and the associated NCCM job.

    If the Change Type is set to NCCM and the user has the required NCCM job permissions, a Job button is displayed next to the Add Task option.

    Clicking this button opens the corresponding page in a new browser tab. The related NCCM job grid is automatically filtered using the Change Summary, allowing users to quickly track the execution status of the job linked to the Change Task.

    Delegation enables users to assign their approval responsibilities to another user for a specified period. Ensures that ongoing approvals are not delayed when the primary approver is unavailable due to planned leave, travel, or other reasons.

    to learn more.

    Implementing a change requires intensive planning, risk analysis, defining tasks, and approvals. To help users achieve this, the "Change" module has the following tabs:

    • Planning - A comprehensive plan is essential for successfully implementing a change. In the planning tab, a user can enter the following details:

      • Rollout Plan - A rollout plan is a detailed step-by-step description of how the change will be implemented in the production environment. The rollout plan is created in such a way that there is minimal impact on the organization. A rollout plan describes whether the change will be implemented in a phased manner or as a whole.

      • Rollback Plan - A rollback plan is a verified step-by-step fallback or back-out plan in case the change implementation doesn't go as expected. It is essential to have a rollback plan when implementing a major change.

    • Attachments - When uploading attachments to a change ticket, Users can classify and organize files for clarity and compliance.

    • Risks - It helps identify, evaluate, and reduce potential risks associated with a change before it is implemented. It offers visibility into possible business, technical, financial, or operational impacts and ensures that suitable mitigation plans are established.

    Risk Records

    Risk Records are used to document or create a knowledge base of the risks associated with a change. They capture critical information such as the risk name, type, description, and mitigation plan.

    Add Record

    Click on Add Record to add the details below:

    Risk Assessment

    It provides a structured way to evaluate the potential risks associated with a change. It involves defining questions with multiple options, assigning weights, and mapping the responses to criticality levels.

    The outcome of the assessment is represented through a riskometer, which indicates the overall risk level associated with the change.

    • Authorized Role: Only Change Managers can perform risk assessments.

    • Riskometer: Displays the criticality level based on assessment responses.

    • Workflow Dependency: Workflows can be configured so that changes move to CAB Approval only after risk assessments are completed.

    • Risk Level: Change priority is automatically updated based on the assessment result.

    Workflow Integration

    • Risk Assessment Mandatory Toggle – Available in every workflow state; disabled by default. If enabled, the assessment must be completed before moving to the next state.

    • CAB Approval Dependency – Transition to CAB Approval can be restricted until the Change Manager completes the risk assessment.

    • Priority Adjustment – Assessment results can automatically update the change request’s priority based on evaluated risk.

    • Workflow Toggle: By default, the Risk Assessment Mandatory toggle is disabled. If enabled, completing the risk assessment becomes mandatory during state transitions.

    Add Assessment

    Risk Assessments cannot be added directly from the Risk tab. Instead, they are created using , which define the assessment questions, weights, and criticality values.

    Skip Assessment: This toggle can only be updated by the Change Manager. When enabled, the risk assessment step can be bypassed.

    Sample Questions | Basic Details

    Riskometer Functionality

    The Riskometer dynamically evaluates the overall risk involved in a change request based on the answers provided.

    Each question is assigned a weight, and each selected option contributes a predefined risk value. The system then calculates the weighted percentage and displays the cumulative risk score on the Riskometer.

    This visual indicator updates automatically and represents the level of risk associated with the change.

    Risk Level Calculation

    The Riskometer determines the final risk level using the total risk weight. The calculation follows these rules:

    • Critical (Red): Risk score above 80

    • High (Orange): Risk score between 61–80

    • Medium (Green): Risk score between 41–60

    • Low (Blue): Risk score between 21–40

    The selected answers are:

    • Q1: Between 20–50 assets → High → Value = 2 (80%)

    • Q2: 1–4 hours downtime → High → Value = 2 (80%)

    • Q3: Core services impacted → Critical → Value = 1 (100%)

    • Q4: Rollback possible but time-consuming → High → Value = 2 (80%)

    Total Weight = 17

    Step 2: Weight % Calculation

    • Q1 → (4 ÷ 17) × 100 = 23.53%

    • Q2 → (5 ÷ 17) × 100 = 29.41%

    • Q3 → (3 ÷ 17) × 100 = 17.65%

    • Q4 → (2 ÷ 17) × 100 = 11.76%

    Step 3: Risk Contribution of Each Question

    Formula:

    Risk Contribution = Risk Value Percentage × Weight Percentage of Question​/ 100

    • Q1: (80 × 23.53) ÷ 100 = 18.82

    • Q2: (80 × 29.41) ÷ 100 = 23.53

    • Q3: (100 × 17.65) ÷ 100 = 17.65

    • Q4: (80 × 11.76) ÷ 100 = 9.41

    Step 4: Final Risk Score

    18.82+23.53+17.65+9.41+10.59=80

    Total Risk Score = 80

    Step 5: Riskometer Result

    • Score = 80

    • According to thresholds: High Risk (Orange)

    *These quick action tools are available only for Major and Minor Changes.

    The Change page also has the following actions.

    *Select at least one change request to enable these options

    This pop-up allows change managers or authorized users to close change requests with the appropriate closure type, category, notes, and timestamped records.

    Priority: Displays the priority of the change. Technicians can change the priority of the change.
  • Service: Service category in which change is requested.

  • Actions: Quick action icons to work on the change.

  • Rollout Plan

  • Rollback Plan

  • Status: Displays the current status of the change. Users can change the status from here as well.

  • Impact Service: Service Category which the change could impact.

  • Priority: The priority of the change.

  • Risk: Risk level of the change.

  • Requester: Displays the name of the requester (initial)

  • Change Manager: Name of the manager overlooking the change request.

  • Change Implementer: Name of the user responsible for change implementation.

  • Actions: Quick action icons to work on the change.

  • Impact - A user can enter the anticipated impact of the change on various dimensions of the organization. It can be categorized into the following:
    • Business

    • Location

    • Department

    • Group

    • User

  • Planned Start Date - The intended date to begin implementing the change.

  • Planned End Date - The intended date to end implementing the change.

  • Tasks - This allows users to define and manage individual tasks involved in executing a change. Each task can be customized with fields such as title, type, priority, due date, and assignee.

  • Choose the current task status:

    • To-Do (Open)

    • Ongoing (In Progress)

    • Blocked (On Hold)

    • Done (Close)

    Priority

    Select from the drop-down

    Indicates task urgency:

    • Low

    • Medium

    • High

    • Critical

    Due Date

    Select date

    Target completion date for the task.

    Actual Start Date

    Select date

    Date when the task was actually initiated.

    Actual End Date

    Select date

    Date when the task was completed.

    Team

    Select from the drop-down

    Choose the team responsible for executing the task.

    Assignee

    Select from the drop-down

    Assign the task to a specific team member.

    Submit

    Click

    Saves the task to the change ticket.

    Cancel

    Click

    Discards the task and closes the dialog.

    Cancel

    Click to abort

    Closes the pop-up without saving the changes.

    Low

    What is the expected downtime duration for the change?

    5

    More than 4 hours

    Critical

    1–4 hours

    High

    Less than 1 hour / Zero downtime

    Low

    What level of business services will be impacted?

    3

    Core services (e.g., customer-facing apps, payment systems)

    Critical

    Internal services (e.g., reporting, HR, internal tools)

    Medium

    Non-critical services (e.g., test/dev environments)

    Low

    How complex is the rollback or recovery plan for this change?

    2

    No rollback possible

    Critical

    Rollback possible but time-consuming

    High

    Simple and tested rollback plan

    Low

    What level of dependency exists on external vendors or third-party systems?

    3

    Multiple critical vendor/third-party dependencies

    Critical

    Limited vendor dependency with partial risk

    Medium

    No vendor dependency

    Low

    Very Low (Blue): Risk score 20 or below

    Q5: Limited vendor dependency” → Medium → Value = 3 (60%)

    Q5 → (3 ÷ 17) × 100 = 17.65%
    Q5: (60 × 17.65) ÷ 100 = 10.59

    If any issues occur while implementing the change, a ticket can be raised.

    Change aging for helpdesk/ ITSM close and resolve conditions

    Grid View includes Aging Metric. Track Change resolution time accurately. Click 'Resolve' or 'Close' to stop the aging clock. Get detailed aging reports based on resolved status.

    Select one or more change requests to assign to a team.

    *Delete

    Select one or more change requests to delete them.

    Pause

    To pause the auto-reload.

    Configure

    To configure the summary card and column selection.

    Actual Closure Date

    Auto-filled or editable

    Actual date and time when the change was completed or formally closed. Example: Aug 01, 2025, 12:53 PM

    Agreed Closure Date

    Select date

    The closure date agreed during CAB or planning discussions. Example: July 31, 2025

    Closure Category

    Select from the drop-down

    Captures the outcome of the change:

    • Successful: Change achieved the intended goal without issues.

    • Successful with Issues: Change succeeded with minor/managed issues.

    • Rollback: Change was reverted due to failure or risk.

    • Partially Implemented: Some objectives were met; others deferred or missed.

    Complete (Button)

    Click to confirm closure

    Finalizes the closure and updates records. Post-closure changes require admin override.

    Reset the Password of an email account.

    Minor Change

    A minor change is a small, low-impact, and low-risk change that only occasionally occurs in an organization. It needs approval from the Change Advisory Board(CAB). It is essential to document all the important information for future reference. A minor change could be converted to a standard change in the future.

    Changes to the company website.

    Major Change

    A major change is a high-risk and high-impact change that could impact an organization's services if it is not planned properly. It requires an in-depth proposal on risk analysis, financial implications, and cost-benefit analysis. It also requires approval from the Change Advisory Board(CAB) and management.

    Changes to Network Infrastructure

    Emergency Change

    Emergency changes are unexpected disruptions that must be assessed and implemented as soon as possible to restore an organization's normal functioning.

    Dealing with a server outage

    Retrospective Change

    Designed to record changes that were implemented urgently without prior documentation or approval. These ensure compliance by logging the change post-implementation for audit and visibility.

    Fixing a critical bug without prior approval.

    Field

    Description

    Requester

    Select the requester for the new change. This can be the same or different from the original change.

    Assignment Details

    Update the assignee or assignment group, if required.

    Label

    Action

    Description / Example

    Title*

    Enter text

    Name or heading for the task.

    Example: Database Backup, Server Reboot

    Description*

    Enter content using the editor

    A short explanation of the task.

    Example: Perform a full DB backup before deployment.

    Type*

    Select from the drop-down

    Choose the nature of the task:

    • Default – Generic task with no specific category.

    • Pilot – Task for trial or limited rollout.

    • Staging Development – Tasks in staging/testing environments.

    • Automation – Tasks handled via scripts or automation tools.

    • Field – On-site/field-level tasks.

    • Recurring – Tasks that repeat on a schedule.

    • Maintenance – Preventive or scheduled maintenance tasks.

    • Work Order – Actionable job-oriented tasks.

    • 3rd Party – Task assigned to an external vendor.

    • NCCM – Tasks related to NCCM configurations or templates.

    Status

    Label

    Action

    Description

    Upload Area

    Drag and drop / Browse to upload

    Upload files (Formats: PNG, JPEG, PDF, DOCX, XLSX, etc., Max size: 20MB).

    Category*

    Select from the drop-down

    Choose a category to classify the attachment:

    • Default Category

    • Change Screenshot

    • Team Document

    • Team Docs

    • Test Plan

    • Dev Plan

    • Impact Assessment

    • Risk Assessment

    • Requirements

    • Rollout Plan

    • Rollback Plan

    • Other

    Description

    Enter text

    Provide a brief note or context about the uploaded attachment.

    Upload

    Click to confirm

    Label

    Action

    Description / Example

    Name

    Enter a name

    Specifies the unique title or identifier of the risk. Example: Database downtime risk.

    Risk Type

    Select from the dropdown

    Defines the category of the risk.

    • Business – Risks affecting operations or service delivery

    • Technical – Risks related to systems, infrastructure, or technology

    • Financial – Risks impacting costs, budget, or revenue

    • Other – Any risk outside the above categories

    Mitigation Plan

    Add mitigation details

    Outlines the steps or strategy to reduce, transfer, or eliminate the identified risk. Example: Schedule backup before change and prepare rollback plan

    Description

    Provide description

    Question

    Weight

    Options

    Option Value

    How many assets will be affected by this server change?

    4

    More than 50 assets

    Critical

    Between 20 and 50 assets

    High

    Name

    Description

    Comment

    A user/technician can see the comments on the change and also can add new comments.

    History

    Shows the history of the current change request from the time it was created.

    Interaction

    Shows the history of the change request created by the requester.

    Attachment

    Shows all the attachments of the current change request.

    Change Source

    Shows the source of the change, like email, web, phone, etc.

    Name

    Description

    Quick Edit

    To perform quick edit actions like change manager, status, priority, urgency, severity, impact service, and the assignee. Use the "Detailed Edit" button to edit the Change details.

    Edit

    To edit the Change in detail.

    Delete

    To delete the Change. This action is irreversible.

    Task

    Shows the tasks involved in the change.

    *Risk

    Shows the risks involved in the change.

    Label/ Icon

    Description

    Expand Icon

    To View the change filters.

    Search Bar

    To help search for a specific change request using the Change ID, assignee, etc.

    Calendar

    To view changes and releases scheduled on the calendar. The calendar supports Month, Week, Day, and List views and allows filtering releases based on status, type, priority, risk, team, and other criteria. Filtered releases are displayed according to their scheduled duration.

    Workspace task App

    Enjoy a seamless and streamlined experience with the powerful capabilities of the Task Common Module for enhanced task management within the application.

    *Tag

    Select a change request to view the tag option. Tagging is a way to group change requests.

    Label

    Action

    Description / Example

    Status

    Auto-filled or selected manually

    Displays the change status (It will be closed).

    Close Change*

    Enter closure summary

    Add final remarks on what was done, implementation outcome, or lessons learned. Example: “ES3 server restored with latest patch deployment.”

    Closed by

    Select from the drop-down

    Choose the user who is closing the change. Example: Deepak Kumar

    Close Type

    Select from the drop-down

    Emergency Change

    Retrospective Change

    What do you see on the screen?

    Working on a Change

    Views of the Change Request

    The new change will retain the same subject structure as the original change, ensuring consistency.

    Note:

    • The quick action bar appears as a floater on each change line and is common in both Panel and Grid views.

    • The summary card details can be configured to suit requirements. Click on the "Configure" icon to customize the details you want to see on the screen.

    • The Configure icon is available only in Grid View.

    Conflict Detection

    Relation

    NCCM Job Association with Change Tasks

    Delegate Approval

    Planning and Risk Analysis

    Risks can be recorded for all change types—Major, Minor, Emergency, and Retrospective. They do not apply to Standard Changes, since these are pre-approved, low-risk, and follow a predefined process.

    These records can only be created and managed by privileged members, ensuring that risk documentation is accurate and controlled.

    Only the Change Manager is authorized to perform risk assessments.

    Assessment results can automatically update the change request’s priority based on evaluated risk.

    Miscellaneous

    Additional Icons

    Quick Actions

    Page Actions

    Close Change

    Problem Management
    NCCM
    CLI Jobs
    Click here
    Risk Templates

    Select from the drop-down

    Uploads the selected file(s) to the Change record.

    Offers detailed context about the risk, including possible causes, expected impact, and scenarios in which the risk might occur.

    Example: Risk of service outage if the server upgrade fails during peak hours

    Less than 20 assets

    *Add Ticket

    *Assignment

    Defines the method and reason for closure:

    • Auto Closure: The system was closed due to no further updates after a set period.

    • Not Solved: Change was implemented, but the issue was not resolved.

    • Solved: The issue was resolved successfully via this change.

    Cancelled (Close)

    Cancelled: Change was withdrawn before implementation.

  • Unsuccessful: Change failed and caused no improvement.